{"id":30,"date":"2024-04-04T01:50:53","date_gmt":"2024-04-03T22:50:53","guid":{"rendered":"https:\/\/sisu.ut.ee\/env-intro\/36-expected-findings\/"},"modified":"2024-04-04T17:21:22","modified_gmt":"2024-04-04T14:21:22","slug":"36-expected-findings","status":"publish","type":"page","link":"https:\/\/sisu.ut.ee\/env-intro\/36-expected-findings\/","title":{"rendered":"3.6. Expected findings"},"content":{"rendered":"<p><span style=\"background: white;\"><span style=\"line-height: normal;\"><span lang=\"EN-GB\"><span style=\"color: #565656;\">It is useful to think about the expected findings during the planning process. These are listed in the ADM as expected findings. Listing expected findings works as a control for weighing the relevance of the selected sub-question.<\/span><\/span><\/span><\/span><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span style=\"background: white;\"><span style=\"line-height: normal;\"><span lang=\"EN-GB\"><span style=\"color: #565656;\">ADM example of audit findings<\/span><\/span><\/span><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1108\" height=\"1168\" src=\"https:\/\/sisu.ut.ee\/wp-content\/uploads\/sites\/145\/screenshot_2021-05-27_at_15.56.38.png\" alt=\"pic\" class=\"wp-image-64\" style=\"width:950px\" title=\"screenshot_2021-05-27_at_15.56.38.png\" srcset=\"https:\/\/sisu.ut.ee\/wp-content\/uploads\/sites\/145\/screenshot_2021-05-27_at_15.56.38.png 1108w, https:\/\/sisu.ut.ee\/wp-content\/uploads\/sites\/145\/screenshot_2021-05-27_at_15.56.38-285x300.png 285w, https:\/\/sisu.ut.ee\/wp-content\/uploads\/sites\/145\/screenshot_2021-05-27_at_15.56.38-971x1024.png 971w, https:\/\/sisu.ut.ee\/wp-content\/uploads\/sites\/145\/screenshot_2021-05-27_at_15.56.38-768x810.png 768w\" sizes=\"auto, (max-width: 1108px) 100vw, 1108px\"><\/figure>\n\n\n\n<p><a href=\"https:\/\/sisu.ut.ee\/wp-content\/uploads\/sites\/145\/intromooc_adm_example_elaborated.pdf\" target=\"_blank\" rel=\"noopener\" data-fid=\"62887\">See more elaborated example of the ADM<\/a><\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"table table-hover\"><tbody><tr><td><img loading=\"lazy\" decoding=\"async\" title=\"\" src=\"https:\/\/sisu.ut.ee\/wp-content\/uploads\/sites\/145\/puzzle2.png\" alt=\"\" width=\"50\" height=\"50\" data-file_info=\"%7B%22fid%22:%2214835%22,%22view_mode%22:%22default%22,%22type%22:%22media%22%7D\"><\/td><td>\n<h3>Tip for an auditor<\/h3>\n<p>An ADM is part of an <strong>audit strategy\/plan<\/strong> whose required elements may differ in different audit offices. In addition to an audit design matrix (ADM), usually auditors should plan the resources (e.g. audit team, experts involved) and timeline of the audit.\u00a0<\/p>\n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table class=\"table table-hover\"><tbody><tr><td><img loading=\"lazy\" decoding=\"async\" title=\"\" src=\"https:\/\/sisu.ut.ee\/wp-content\/uploads\/sites\/145\/test2.png\" alt=\"\" width=\"67\" height=\"71\" data-file_info=\"%7B%22fid%22:%2214836%22,%22view_mode%22:%22default%22,%22type%22:%22media%22%7D\"><\/td><td>\n<h3>Thinking exercise \u2013\u00a0ADM (5\/5)<\/h3>\n<p>You have chosen the problematic environmental\/sustainability issue to audit in your country and given a title to your imaginary audit (thinking exercise\u00a0in sub-chapter 2.3), you have also set the objective, formulated the main audit question and\/or sub-questions, criteria and selected the audit methods\u00a0(sub-chapters 3.2-3.5).\u00a0<\/p>\n<p>Finally, imagine what could be the possible preliminary <strong>findings <\/strong>of your audit.<\/p>\n<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>It is useful to think about the expected findings during the planning process. These are listed in the ADM as expected findings. Listing expected findings works as a control for weighing the relevance of the selected sub-question. ADM example of &#8230;<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"class_list":["post-30","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/sisu.ut.ee\/env-intro\/wp-json\/wp\/v2\/pages\/30","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sisu.ut.ee\/env-intro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sisu.ut.ee\/env-intro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sisu.ut.ee\/env-intro\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/sisu.ut.ee\/env-intro\/wp-json\/wp\/v2\/comments?post=30"}],"version-history":[{"count":2,"href":"https:\/\/sisu.ut.ee\/env-intro\/wp-json\/wp\/v2\/pages\/30\/revisions"}],"predecessor-version":[{"id":309,"href":"https:\/\/sisu.ut.ee\/env-intro\/wp-json\/wp\/v2\/pages\/30\/revisions\/309"}],"wp:attachment":[{"href":"https:\/\/sisu.ut.ee\/env-intro\/wp-json\/wp\/v2\/media?parent=30"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}